For Better Performance Please Use Chrome or Firefox Web Browser

Projects

Current Projects:

  • ...
  • Synthesize and characterization of nano crystalline Ni3Al intermetallic
  • Synthesize and characterization of nano crystalline TiAl intermetallic
  • TLP Welding of Ni3Al intermetallic
  • Manufacturing and characterization of nanocrystalline oxide metal gas sensors
  • Hydrogen storage in 3D graphene structures
  • Manufacturing and characterization of transparent composite ceramics
  • Influence of buttering layer on the mechanical properties of austenitic stainless steel welds
  • Spark plasma sintering of Stellite superalloy
  • Spark plasma sintering of Colmonoy superalloy
  • Synthesize and characterization of high entropy magnetic alloys 
  • Failure analysis of cracks in heavy plates plain carbon steels

 

 

 

Finished Projects:

  • ...
  • Failure analysis of ethylene cracking tubes, Arya Sasool Petrochemical Plant, 2018
  • Improving ductility of ERW pipes, Safa Steel Pipe Mill, 2017
  • Inspection wellhead equipments at FRAMES, The Netherlands, 2017
  • Microbial corrosion in fire water pipeline in Fajr Petrochemical Complex, 2017
  • Remainig lifetime assesment of fire pipeline in Fajr Petrochemical Complex, 2017
  • Failure analysis of broken cable, FRIESLAND CAMPINA, The Netherlands, 2016
  • Failure analysis of cracking in dissimilar welds, VDM Germany, 2016
  • Failure analysis of corrosion-fatigue related failures in structural steels, EU Project, 2013-2015
  • Failure analysis of corrosion-related failures in geothermal installations, EU Project, 2013-2015
  • Stress relaxation cracking-induced failures in high temp steels and superalloys, EU project, 2013-2015
  • Failure analysis of ethylene heater tubes, CB&I, The Netherlands, 2015
  • Failure analysis of broken joints, THYSSENKRUPP, Germany, 2015
  • Failure analysis of leakage in plate heat exchangers, Vivera, The Netherlands, 2015
  • Failure analysis in centri-cast austenitic steel tubes, TECHNIP, The Netherlands, 2015
  • Failure analysis of broken pins and bolts, Metro Rotterdam, The Netherlands 2015
  • Failure analysis of cracking in vaporizers, ABUQIR, Egypt, 2015
  • 3D Printing of Ti6AlV4 parts, TNO The Netherlands, 2015
  • Stress relaxation cracking in high temp steels and superalloys, EU Project, 2013-2015
  • Failure analysis of cracking in reformer tubes, ABUQIR, Egypt, 2014 
  • Creep in centri-cast austenitic steels, Technip, The Netherlands, 2014
  • Failure analysis of regen heater tubes, RasGas, South Korea, 2014
  • Cracking of tail gas pipeline, Yara, Norway, 2014
  • Creep in centri-cast austenitic steels, Technip The Netherlands, 2014
  • Failure analysis of leakage in heat exchanger, BALTIMORE, The Netherlands, 2014 
  • Failure analysis of reformer feeds, CB&I, The Netherlands 2014
  • Failure analysis of broken windmills, RWE, The Netherlands 2014
  • Failure analysis of a broken clamp, POLITIE, The Netherlands 2014
  • Failure analysis of broken propeller shaft, ZF Marine, The Netherlands, 2014
  • Metal dusting corrosion in high temperature nozzles, British Petroleum UK, 2013
  • Failure analysis of cracked radiant tubes, HYCO PLANT, The Netherlands 2013
  • Failure analysis of coke-blocked reformer tubes, CB&I, The Netherlands 2013 
  • Inspection Mechanical roofing frameworks for fuel tanks at CTS, The Netherlands, 2013
  • Metal dusting corrosion in nozzles, BP UK, 2013
  • Residual stress measurements in thick weld sections, BP UK, 2013
  • Production of recrystallized AA6005A profiles for ALSTOM France, Nedal, The Netherlands, 2012
  • Developing/Applying a pressure test to evaluate the formability of extruded pipes, Boal The Netherlands, 2011
  • Inspection Seamless stainless and alloy steel pipes at ZEGSTAAL, The Netherlands, 2011
  • Inspection Seamless stainless and alloy steel pipes and fittings at BOSAL, Belgium, 2010
  • Inspection Electrical motors, produced by WEG Brazil, 2010
  • Inspection Gearboxes used at power plants, HANSEN, Belgium, 2010
  • Inspection Air compressor and dryer packages at AIRPACK, The Netherlands, 2009
  • Production of first stage nozzle GE F5 (from Co-based superalloy FSX-414) with all of the components, Tajrobeh Noor Iran, 2003-2005
  • Production of 4th stage BBC nozzle type 9 (From Ni-based superalloy INKONEL 718), Tajrobeh Noor Iran, 2003-2005